You stay at home while the ducts are sealed.

The liner goes into the ventilation ducts that are already there. No walls are torn down, and the installer needs to come into your apartment twice for a short time.

A man in an attic feeding a white liner into a duct.

The work starts on the roof or in the attic.

The installer usually enters the ducts from above. At first you will rarely notice the work.

The installer comes in twice.

The first time, the duct is filmed and measured. The second time, the liner goes in. Each visit takes about 20 minutes.

Ask the association or the property owner when the visits will be.

Floors and surfaces are protected.

The installer covers floors and surfaces where the work is done. Protection and material are removed straight afterwards, and no walls or ducts are torn down.

A job normally takes two working days per riser.

You live at home as usual during the whole job.

Tight ducts carry the air out.

When the ducts leak, cooking smells and smoke can spread between apartments. After sealing, the exhaust air goes through the duct and out of the building.

The liner is type approved.

The liner with the polymer has type approval TG 1825 from Kiwa. Linervent was founded in 2014 and makes the liner in Ekerö, Sweden.

TG 1825 type approvalHow duct sealing works

Questions about the work in your apartment?

The association or the property owner knows when the work is done. We are happy to answer questions about the liner and the method.

Contact us